CONRAC construction delays 2026 — traveler tips
Verified: 2026-05-30
Quick answer
Allow +15 min shuttle and highway buffer
Detailed answer
Port and agency advisories note ongoing work near 3150 S 160th St. Check day-of WSDOT.
Machine-readable
Verified: 2026-05-30
Allow +15 min shuttle and highway buffer
Port and agency advisories note ongoing work near 3150 S 160th St. Check day-of WSDOT.
Machine-readable