Agent discovery: llms-knowledge.txt, developers hub, api-catalog, knowledge MCP search_knowledge
Visitor Guide/Visitor Guides
Visitor Guides

What are the current construction and facility delay warnings for the SeaTac Rental Car Facility?

Verified: 2026-06-25

At a glance

Travelers should be aware of ongoing construction at the SeaTac Rental Car Facility, which may cause significant delays.

What to know

Topic-specific long guide — no rental shuttle/CFC boilerplate

Visitor guide details

What to expect on your trip

  • The Consolidated Rental Car Facility at Seattle-Tacoma International Airport is currently undergoing construction, resulting in significant delays for travelers coming and going from the facility.
  • As of March 2023, the construction is expected to continue until late 2024.
  • Travelers are advised to allocate extra time, at least 30-45 minutes, when traveling to or from the facility during peak hours (usually between 5 am and 10 pm).
  • The facility is located at 17801 International Blvd, SeaTac, WA 98188, and is accessible via the Rental Car Center shuttle bus, which runs every 10-15 minutes.
  • To minimize delays, travelers can consider visiting the facility during off-peak hours or using alternative transportation options.

The Consolidated Rental Car Facility at Seattle-Tacoma International Airport is currently undergoing construction, resulting in significant delays for travelers coming and going from the facility. As of March 2023, the construction is expected to continue until late 2024. Travelers are advised to allocate extra time, at least 30-45 minutes, when traveling to or from the facility during peak hours (usually between 5 am and 10 pm). The facility is located at 17801 International Blvd, SeaTac, WA 98188, and is accessible via the Rental Car Center shuttle bus, which runs every 10-15 minutes. To minimize delays, travelers can consider visiting the facility during off-peak hours or using alternative transportation options. Additionally, travelers can check the airport's website or contact their rental car company for the latest updates on construction and traffic conditions. The airport's traffic management team is working to minimize disruptions, but travelers should still expect occasional lane closures and traffic congestion.

Related

Back to Visitor Guide