July peak shuttle waits SeaTac CONRAC
Verified: 2026-05-30
Quick answer
8–12 min shuttle; 30 min counter without loyalty
Detailed answer
Aligns with highest rate month market-wide.
Machine-readable
Verified: 2026-05-30
8–12 min shuttle; 30 min counter without loyalty
Aligns with highest rate month market-wide.
Machine-readable